PIX 3(1): MEN AT WORK IN THE SITE FOR THE INSTALLATION OF THE TRANSFORMER.

PIX 3(1): Electrical Personnel Working Hard To Install The 500 KVA Transformer, Right There In Obio-Akpor Cluster.

PICTURE NO. 3: THE SUPPLY & INSTALLATION OF 500 KVA TRANSFORMER IN OBIO-AKPOR CLUSTER.

PICTURE NO. 3: 500 KVA Transformer Supply & Installation Project Going On In Obio-Akpor Cluster.

PIX 2(3): DELEGATES FROM THE BOT ON SITE INSPECTION TO THE SOLAR POWERED LIGHT PROJECT AT ALUU, IKWERRE CLUSTER..

PIX 2(3): The NOPL-HCDT BOT Delegate To The Project Site, Examining The Readiness Of The Project before Commissioning.

PIX 2(2): THE FULLY INSTALLED SOLAR POWERED LIGHTING PROJECT IN OMUCHI COMMUNITY- IKWERRE CLUSTER.

PIX 2(2): Very Carefully, You Can See The Green Colored Solar Powered Poles Standing. Courtesy of NOPL-HCDT.

PIX 2(1): THE BOT DELEGATES ON INSPECTION TOUR TO DETERMINE THE LEVEL OF THE PROJECT & ITS READINESS  BEFORE COMMISSIONING.

PIX 2 (1): NOPL-HCDT BOT Delegates Inspecting The Extent of The Job Done In The On Going Solar Powered Light…

PICTURE NO. 2: PROCUREMENT & INSTALLATION OF 25 NOS SOLAR POWERED LIGHTING IN OMUCHI COMMUNITY, ALUU IN IKWERRE CLUSTER BY NOPL-HCDT.

PICTURE NO. 2: The People Of Omuchi Community, Aluu In Ikwerre Cluster Was Very Happy At The Sighting Of NOPL-HCDT…

PIX 4(1): DISPLAYING THE BLOCK LAYING STAGE OF THE BUILDING CONTRACT OF SIX CLASS ROOM BLOCK & FURNISHING IN STATE SCHOOL 3, AWARDED BY NOPL-HCDT IN IBAA CLUSTER..

PIX 4(1): The View Of The Block Laying Stage Of The Building Project Of The Six Class Room Block At…

PIX 3(31): NOW THE SITE IS READY FOR BLOCK LAYING.

PIX 30: Done With Excavation, Progressing To The Laying Stage Now.

PIX 3(30): THE GROUND WELL EXCAVATED.

PIX 30: The Ground Widely Open Now, Waiting For Bricks.

PIX 3(29): EXPERIENCED WORK MEN DIGGING FOUNDATION.

PIX 29: The View of Hardworking Men In The Site.